Development support - San Marcos de Colón

Image 1 of 1
San Marcos de Colón
Wind Farm Location: San Marcos, Honduras
Capacity: 50 MW + Chinchayote extension
WTG Model: 25 x Gamesa G90
Commissioning Date: 2015
Project Value: Around € 150 million
Involvement: Owner’s Engineer:

  • Basic layout design
  • Basic Electrical Design
  • Basic Civil Design
  • Tender management
  • Contract negotiations
  • Quality Audits
Clients:
  • Gruppo Terra
  • Vientos de Electrotecnia SA

 

Related links:

http://www.4coffshore.com/windfarms/gwynt-y-m%C3%B4r-united-kingdom-uk09.html

In the news

https://www.fmo.nl/k/n1771/news/view/14015/20819/fmo-arranges-usd-127-5-mln-in-loans-for-san-marcos-wind-farm-in-honduras.html