Wind Power Plant Description
Windpark Nieuwe Hemweg is the result of the restructuring of an existing wind farm in Westpoort. The restructuring consists of removing 8 existing turbines from the same location and 4 others at the “Lely” wind farm from the port of Medemblik. The latter was already done in 2016. 6 new 2-3.3 MW turbines will be installed, increasing the wind farms total capacity from 7.3 MW to 19.8 MW.
For more information, please contact us
Project Description
Responsible for the restructuring of the wind farm is Vattenfall. Formerly known as NUON Wind Development BV. The overall project is a co-operation between Vattenfall and NS (Dutch Railways). The site is property of NS and located in a difficult industrial area with railroads, underground infrastructure and chemical industry in the close proximity.
The role of IX wind is:
- to coordinate complex permitting processes,
- Develop HSE plans for the construction an operation in this complex environment
- Develop logistic- and lifting plan for the construction of the windfarm.